Growing oil palm in Cameroon
Selected tenera palms start bearing after about three years. Ripe bunches are cut every seven to ten days and must reach the mill within 48 hours; more than three quarters of the crop comes from December to May.
What a hectare costs over 10 years
All the costs of one hectare of open field in the Foumbot area over the 10 years of the plan, on rented land with hired labour, on rain alone, planted in April. The capital needed, above, is lower than this total because the harvests pay for part of the work.
| Item | Amount | Share |
|---|---|---|
| Fertilizers | 1,418,000 FCFA | 22% |
| Labour | 1,359,000 FCFA | 21% |
| Equipment bought up front | 1,208,000 FCFA | 19% |
| Land | 1,000,000 FCFA | 16% |
| Agronomist | 500,000 FCFA | 8% |
| Harvest, packaging and transport | 476,000 FCFA | 7% |
| Planting material | 320,000 FCFA | 5% |
| Herbicides | 65,000 FCFA | 1% |
| Seeds | 12,000 FCFA | <1% |
| Total | 6,357,000 FCFA |
What you already have changes the budget
The figures above start from nothing. Each line removes what a farmer may already own, everything else unchanged and labour still hired.
| Already in place | Capital for 1 ha | Difference |
|---|---|---|
| Own land, no rent to pay | 2,409,000 FCFA | −440,000 FCFA |
| Hand tools already owned | 2,259,000 FCFA | −590,000 FCFA |
| Land and tools | 1,819,000 FCFA | −1,030,000 FCFA |
Calendar
Time is counted from planting.
| Step | When |
|---|---|
| Site and seedlings | Before planting |
| Clearing | Before planting |
| Staking | Before planting |
| Cover crop | Before planting |
| Holes | Before planting |
| Planting and rodent guards | Year 1 |
| Circle weeding | Years 1 to 10 |
| Fertilizer, young palms | Years 1 to 3 |
| Weeding and herbicide | Years 1 to 10 |
Yield and price
- At full production · 4.0 to 16.0 t/ha, 13.0 t/ha on average
No farm gate price series is published for Cameroon. Observed in June 2025: village plantations paid about 80,000 FCFA a tonne of bunches, down from 105,000 FCFA.
The plan covers its costs from 95,494 FCFA per tonne at the average yield.
Water and risks
Least risky start month with this water option: April.
Rodents damage young palms: protect them with mesh guards. Bunches must reach the mill within 48 hours (OP1).
Cut ripe bunches every 7 to 10 days and deliver them to the mill within 48 hours; more than three quarters of the crop comes from December to May.
Plan your own plantation
Enter your capital or your area, your water option and your start date: the planner adapts the budget, the calendar and the risks to your case.
Sources
- [OP1] Fiche technico économique de conduite d’une palmeraie (Fiche technico économique 2) · MINADER, Direction des organisations professionnelles agricoles et de l’appui aux exploitations, 2025
- [OP2] Cameroun : développer les palmiers à huile des agriculteurs · IPS (citing MINADER), 2013
- [OP3] Dibombari : la Socapalm organise une réunion avec les responsables des plantations villageoises · Le Tamtam du Mboa, 2025
- [M1] Crop evapotranspiration: guidelines for computing crop water requirements (FAO Irrigation and Drainage Paper 56) · FAO (Allen R.G., Pereira L.S., Raes D., Smith M.), 1998